Bringing scientific rigour to the next generation of credits.
Reimagine Avoidance
Questioning everything
Revalue takes the latest certification standards as the start line, not the finish line.
Better baselines, dynamically checked.
Poor baselines are the #1 problem with traditional avoidance projects.
We meet the latest Certification Standards (Core Carbon Principles aligned).
Model R goes further. We build Dynamic Baseline Checks using Synthetic Controls.
Dynamic Baselines Checks capture real world impact, giving confidence in every credit.
LiDAR for more accurate biomass estimations.
Traditional methods for estimating biomass lack accuracy validation and can lead to a greater than 1.5x difference in biomass estimates versus reality.
Under-canopy LiDAR for improved accuracy and precision in plots.
Drone-based LiDAR for greater range.
Deflated baselines. 1.2 tons per credit.
Historically, too many historic credits equated to less than 1 ton of real world emissions.
Model R gives you confidence that each credit is at least 1.0 ton of real world impact.
We deflate the baseline even after using conservative assumptions, LiDAR-backed biomass estimations, and Dynamic Baseline Checks.
Credits you (and the planet) can trust.
eDNA+ for advanced biodiversity monitoring.
Historical biodiversity monitoring has been constrained by resource and technological limitations.
eDNAfor more effective identification of species present.
Bioacoustics + camera trapsfor even richer data on where species are present.
Our connectivity metric measures the change in habitat connectivity over time.
Next-level community impact measurements.
In the past it has been hard to get a real understanding of the impact on and role of local communities in the project.
Scientifically rigorous community surveys to understand the real impact for communities.
Effective sampling strategies, unbiased questions and advanced analytics to draw statistical significance.
Survey after FPIC to get a day-zero check on FPIC effectiveness and address flags upfront.
Model R Includes
We have not stopped at a few improvements.
Our models come with all guardrails built-in.
Ratings agency assurance
Pre issuance ratings to get third-party validation on project fundamentals.
Resilience reserve
Capital reserve which can be drawn down in case of delays or issues.
Risk insurance
Insurance covering key risks, such as political and delivery risks.
Always additional
Additionality checks ahead of every issuance.
Article 6 authorisation
Approval for Corresponding Adjustments (CAs) where jurisdictionally appropriate.
Computer vision monitoring
Deep learning to identify new roads and other important events in the landscape.